News of delays seems to have calmed down a bit recently. I hope my car doesn't get partially built then wait for parts for weeks.

TimF
Posts: 204
Joined: Wed Jun 23, 2021 6:41 am

Post by TimF »

Ordered end of June. In early August got "confirmed" production start of week 34 (week beginning Aug 23) - which the dealer said was hypothetical as production was then running about 8 weeks late, so to expect "production around the middle of October and delivery maybe mid November". Which was what we'd been advised when we placed the order. Nothing specific since then.
User avatar
smuj
Posts: 129
Joined: Sun Jul 11, 2021 3:15 pm
Location: Herefordshire

Post by smuj »

Emailed my dealer earlier today and the girl I’ve been dealing with was most helpful. I’ve been given a build week of 39 (27 September), order went in 11 July. She is still talking of delivery end of November; no problem. I’ve asked for an update first week of October which she’s happy to do.

I asked about VW removing the tracker and SMS updates. Replied that it’s due to component shortage. Production up and down daily and the tracker a waste of time as build weeks are all over the place. Not sure if this is official fromVW or just what the dealer thinks although it makes sense to me.

Now need to think about a home charger in a couple of weeks.
Smuj

I’m an analogue man in a digital world
———————————————————————————————————
Family Pro Performance 58KW. Stonewashed Blue, East Derry wheels.
epicwinningmaz
Posts: 122
Joined: Tue Aug 10, 2021 11:53 am

Post by epicwinningmaz »

smuj wrote: Tue Sep 07, 2021 6:17 pm Emailed my dealer earlier today and the girl I’ve been dealing with was most helpful. I’ve been given a build week of 39 (27 September), order went in 11 July. She is still talking of delivery end of November; no problem. I’ve asked for an update first week of October which she’s happy to do.

I asked about VW removing the tracker and SMS updates. Replied that it’s due to component shortage. Production up and down daily and the tracker a waste of time as build weeks are all over the place. Not sure if this is official fromVW or just what the dealer thinks although it makes sense to me.

Now need to think about a home charger in a couple of weeks.
That makes sense. Imagine so many requests per day with very few changes and imagine it's for every VW car order lol. It's kind of a waste of computation and internet traffic tbh. I imagine they'll bring it back when lead times reduce
ID.3 Max Pro Performance Makena Turquoise

Week 34 - Stage 1 Order Complete
Week 35 - Stage 2 With the Factory
Week 38 - Stage 3 Build Week Scheduled for Wk22/2022
??? - Stage 4 Build Week Confirmed
??? - Stage 5 In Transit
slef2003
Posts: 63
Joined: Sat Aug 21, 2021 6:09 pm
Location: Norfolk

Post by slef2003 »

shire-dweller wrote: Wed Sep 01, 2021 1:27 am
AndersG wrote: Four months for us. Almost like getting a Trabi in the GDR :)
 
It got me reading Wikipedia on the Trabant, and I found a couple more similarities with the ID.3:
https://en.wikipedia.org/wiki/Trabant wrote:Known for its dull colour scheme [...]
 
Turquoise apart, I think the ID.3 colour scheme would make the Trabant proud. :-)
https://en.wikipedia.org/wiki/Trabant wrote:The free market price for a second-hand one [Trabant] was more than twice the price of a new one
 
Currently, one-year-old cars can be more expensive than new cars (Lunatic used car valuations). OK, not more than twice the price, but the waiting time for the ID.3 is also not as long as the 10 to 13 years waiting time for the Trabant. Not yet, anyway.

And of course, both made in Germany (ish). Luckily that's where I think the similarities end:
https://en.wikipedia.org/wiki/Trabant wrote:The engine produced a very smoky exhaust and was a significant source of air pollution: nine times the hydrocarbons and five times the carbon-monoxide emissions of the average 2007 European car. [...] Since the engine was two-stroke, oil had to be added to the 24-litre fuel tank at a 50:1 (or 33:1) ratio of fuel to oil at each fill-up. [...] Earlier models had no fuel gauge, and a dipstick was inserted into the tank to determine how much fuel remained.
 
At least on the tech, we've come a long way: microchips everywhere! Except in VW's factories. :-)

Wasn't the Trabant also made in Zwickau
20.08.21 Order Tour Pro S Bog Standard Robinsons VW Lowestoft
Order Number 31435***
16.02.22 Given Build Week 37
29.05.22 Given Build Week 34
02.07.22 Given Build Week 36!
12.08.22 Given Build Week 48!
02.23 confirmed build week 09
Collection 28.04.23
sidehaas
Posts: 1788
Joined: Fri Aug 27, 2021 7:04 am

Post by sidehaas »

smuj wrote: Tue Sep 07, 2021 6:17 pm Emailed my dealer earlier today and the girl I’ve been dealing with was most helpful. I’ve been given a build week of 39 (27 September), order went in 11 July. She is still talking of delivery end of November; no problem. I’ve asked for an update first week of October which she’s happy to do.

I asked about VW removing the tracker and SMS updates. Replied that it’s due to component shortage. Production up and down daily and the tracker a waste of time as build weeks are all over the place. Not sure if this is official fromVW or just what the dealer thinks although it makes sense to me.

Now need to think about a home charger in a couple of weeks.
Similar timescales from order to build for us - we ordered in the first week of August and were given a provisional build week a couple of days ago of week 42 (18 October.) Dealer also talking about November delivery (an advance on the December estimate when we ordered) but I'd be happy with anything before Christmas.
ID.3 Family Pro Performance (Jan 22), Makena Turquoise / East Derry alloys. Ohme Home Pro charger.
User avatar
smuj
Posts: 129
Joined: Sun Jul 11, 2021 3:15 pm
Location: Herefordshire

Post by smuj »

sidehaas wrote: Tue Sep 07, 2021 9:16 pm
smuj wrote: Tue Sep 07, 2021 6:17 pm Emailed my dealer earlier today and the girl I’ve been dealing with was most helpful. I’ve been given a build week of 39 (27 September), order went in 11 July. She is still talking of delivery end of November; no problem. I’ve asked for an update first week of October which she’s happy to do.

I asked about VW removing the tracker and SMS updates. Replied that it’s due to component shortage. Production up and down daily and the tracker a waste of time as build weeks are all over the place. Not sure if this is official fromVW or just what the dealer thinks although it makes sense to me.

Now need to think about a home charger in a couple of weeks.
Similar timescales from order to build for us - we ordered in the first week of August and were given a provisional build week a couple of days ago of week 42 (18 October.) Dealer also talking about November delivery (an advance on the December estimate when we ordered) but I'd be happy with anything before Christmas.
Mid to end of November was always the original estimate for delivery. Although she did make a throwaway remark along the lines of may get it for Christmas if all goes well ;)

Luckily I’m in no hurry.
Smuj

I’m an analogue man in a digital world
———————————————————————————————————
Family Pro Performance 58KW. Stonewashed Blue, East Derry wheels.
korky
Posts: 35
Joined: Wed Jul 14, 2021 7:40 pm

Post by korky »

i got my confirmation order this week, did order it around 4 weeks back too, estimated delivery late jan!
degur
Posts: 13
Joined: Thu Sep 09, 2021 7:22 pm

Post by degur »

Hi everyone, I’ve been lurking for a while having placed my order back on the 3rd of July for a Life Pro with assistance pack. I received my order number by the 6th of July. Still awaiting a build date confirmation here. Order number starts 3135.
Life Pro W/ Assistance Pack in Moonstone Grey
Ordered 2nd July 2021
Build week: ????
epicwinningmaz
Posts: 122
Joined: Tue Aug 10, 2021 11:53 am

Post by epicwinningmaz »

degur wrote: Thu Sep 09, 2021 7:27 pm Hi everyone, I’ve been lurking for a while having placed my order back on the 3rd of July for a Life Pro with assistance pack. I received my order number by the 6th of July. Still awaiting a build date confirmation here. Order number starts 3135.
Did you check with VW live chat/dealership? They said build date should be confirmed within 2-3 weeks of factory order being accepted
ID.3 Max Pro Performance Makena Turquoise

Week 34 - Stage 1 Order Complete
Week 35 - Stage 2 With the Factory
Week 38 - Stage 3 Build Week Scheduled for Wk22/2022
??? - Stage 4 Build Week Confirmed
??? - Stage 5 In Transit
monkeyhanger
Posts: 1273
Joined: Sat Mar 20, 2021 1:33 pm

Post by monkeyhanger »

metcast wrote: Fri Sep 10, 2021 7:38 am
degur wrote: Thu Sep 09, 2021 7:27 pm Hi everyone, I’ve been lurking for a while having placed my order back on the 3rd of July for a Life Pro with assistance pack. I received my order number by the 6th of July. Still awaiting a build date confirmation here. Order number starts 3135.
Did you check with VW live chat/dealership? They said build date should be confirmed within 2-3 weeks of factory order being accepted
Build week isn't confirmed until about 4 weeks before it is actually built. It is at that point that modification to the order cannot be made and VW has secured/allocated all parts required to your order.
Cupra Born V2 e-boost 230ps Aurora Blue, replaced ID3 PP Family

Audi S3 - because I hate rapid charging for long distance driving.

Octopus referral: https://share.octopus.energy/lush-fawn-565
epicwinningmaz
Posts: 122
Joined: Tue Aug 10, 2021 11:53 am

Post by epicwinningmaz »

monkeyhanger wrote: Fri Sep 10, 2021 8:18 am
metcast wrote: Fri Sep 10, 2021 7:38 am
degur wrote: Thu Sep 09, 2021 7:27 pm Hi everyone, I’ve been lurking for a while having placed my order back on the 3rd of July for a Life Pro with assistance pack. I received my order number by the 6th of July. Still awaiting a build date confirmation here. Order number starts 3135.
Did you check with VW live chat/dealership? They said build date should be confirmed within 2-3 weeks of factory order being accepted
Build week isn't confirmed until about 4 weeks before it is actually built. It is at that point that modification to the order cannot be made and VW has secured/allocated all parts required to your order.
You're right. Sorry, what I mean to say was an estimated build date should be given within 2-3 weeks after factory accepts order. It's then only confirmed 4 weeks before.
ID.3 Max Pro Performance Makena Turquoise

Week 34 - Stage 1 Order Complete
Week 35 - Stage 2 With the Factory
Week 38 - Stage 3 Build Week Scheduled for Wk22/2022
??? - Stage 4 Build Week Confirmed
??? - Stage 5 In Transit
joshgiova
Posts: 26
Joined: Fri Sep 10, 2021 4:38 pm

Post by joshgiova »

Hi everyone, been reading this board since ordering on 2nd July, just thought I would update with my order progress as well.

ID3 Tour Pro S - Ordered 2nd July
BW 34 w/c 23rd August

Latest update from VW UK live chat as of today is car is at Emden awaiting ship. Looking at about 12 weeks from order to delivery, so seems like good going compared to most.
Order Placed (3124xxxx) - 2nd July 21
Build Week - 34 w/c 23rd August 21
Arrived at Emden - 20th September 21
Released to shipping - 4th October 21
Shipped to UK - 6th October 21
Arrived in the UK - 8th October 21
At Dealer - 18th October 21
degur
Posts: 13
Joined: Thu Sep 09, 2021 7:22 pm

Post by degur »

joshgiova wrote: Fri Sep 10, 2021 4:45 pm Hi everyone, been reading this board since ordering on 2nd July, just thought I would update with my order progress as well.

ID3 Tour Pro S - Ordered 2nd July
BW 34 w/c 23rd August

Latest update from VW UK live chat as of today is car is at Emden awaiting ship. Looking at about 12 weeks from order to delivery, so seems like good going compared to most.
You lucky so and so :)
Life Pro W/ Assistance Pack in Moonstone Grey
Ordered 2nd July 2021
Build week: ????
Newfie
Posts: 540
Joined: Thu Jul 01, 2021 7:09 pm
Location: East Yorkshire

Post by Newfie »

Currently there is one ship in Emden with no destination as yet but usually does the Grimsby trip and sometimes goes on to Tyne afterwards.
ID.3 Tour 77kWh Pro S 204PS Manganese Grey S/W 3.2
On order Skoda Enyaq 85X Sportline Plus
User avatar
Utumno
Posts: 1727
Joined: Sun Jul 04, 2021 12:34 am
Location: Oxfordshire

Post by Utumno »

joshgiova wrote: Fri Sep 10, 2021 4:45 pm Hi everyone, been reading this board since ordering on 2nd July, just thought I would update with my order progress as well.

ID3 Tour Pro S - Ordered 2nd July
BW 34 w/c 23rd August

Latest update from VW UK live chat as of today is car is at Emden awaiting ship. Looking at about 12 weeks from order to delivery, so seems like good going compared to most.

Nice. Do you know if this was a full on factory order (mine was) or whether your dealer already had one on back order that was allocated to you ? Our order went in a couple weeks after yours, and it’s going to be at least week 40 before it goes into assembly, if not later.
Tesla Model Y Long Range
CANCELLED : ID.3 Tour (long story :lol:)

ID3 Build & Delivery Info Tracker : https://tinyurl.com/id3tracker
Octopus Referral : https://share.octopus.energy/aqua-foal-203
van
Posts: 76
Joined: Fri Aug 06, 2021 9:42 am
Location: East Sussex

Post by van »

Indeed, lucky so and so. News reports from the last few days say that semi-conductor shortages were exacerbated by Covid causing factories in Malaysia to close down, and although other areas, like Taiwan, are trying to ramp production there will be shortages for some time to come. VW think things may improve in the next quarter (Oct-Dec?) and "hope" to get back to normal "some time" in 2022. We ordered 8th Aug and expecting a call from the dealer soon with an update, but I suspect they won't want to proactively ring with bad news! Still, they said Jan 22, hopefully Dec 21 when we ordered so there's still some time to go yet.
Family Pro Moonstone Grey
East Derry alloys, Heat pump.
Ordered 5 Aug 21.
Build started 18 Nov 21.
Left Factory 3 Feb 22.
Arrived with dealer 27 Feb 22.
Collected from dealer 9 Mar 22.
epicwinningmaz
Posts: 122
Joined: Tue Aug 10, 2021 11:53 am

Post by epicwinningmaz »

Newfie wrote: Fri Sep 10, 2021 5:19 pm Currently there is one ship in Emden with no destination as yet but usually does the Grimsby trip and sometimes goes on to Tyne afterwards.
How are you checking this?

How long does it normally en-route to UK?
ID.3 Max Pro Performance Makena Turquoise

Week 34 - Stage 1 Order Complete
Week 35 - Stage 2 With the Factory
Week 38 - Stage 3 Build Week Scheduled for Wk22/2022
??? - Stage 4 Build Week Confirmed
??? - Stage 5 In Transit
Newfie
Posts: 540
Joined: Thu Jul 01, 2021 7:09 pm
Location: East Yorkshire

Post by Newfie »

metcast wrote: Fri Sep 10, 2021 5:58 pm
Newfie wrote: Fri Sep 10, 2021 5:19 pm Currently there is one ship in Emden with no destination as yet but usually does the Grimsby trip and sometimes goes on to Tyne afterwards.
How are you checking this?

How long does it normally en-route to UK?
The Marine Traffic website. This should show Emden port and The City of Rotterdam is the ship that frequently ships to Grimsby and Tyne, https://www.marinetraffic.com/en/ais/ho ... 39/zoom:15
The running of ships has slowed down a lot over the last few weeks. Many of the ships that make the journey from Emden to the UK are eithered moored up at the last port and at anchor. I have never seen it so quiet.
The Ems Highway is due to dock at Grimsby at 20.30 tonight.
The time to cross is around 24 hours but sometimes depending on tide it takes a little longer to dock.
When my Tiguan was shipped over 3 years ago it sat in the Humber Estuary for 2 days as it was too windy to dock.
ID.3 Tour 77kWh Pro S 204PS Manganese Grey S/W 3.2
On order Skoda Enyaq 85X Sportline Plus
epicwinningmaz
Posts: 122
Joined: Tue Aug 10, 2021 11:53 am

Post by epicwinningmaz »

Newfie wrote: Fri Sep 10, 2021 6:06 pm
metcast wrote: Fri Sep 10, 2021 5:58 pm
Newfie wrote: Fri Sep 10, 2021 5:19 pm Currently there is one ship in Emden with no destination as yet but usually does the Grimsby trip and sometimes goes on to Tyne afterwards.
How are you checking this?

How long does it normally en-route to UK?
The Marine Traffic website. This should show Emden port and The City of Rotterdam is the ship that frequently ships to Grimsby and Tyne, https://www.marinetraffic.com/en/ais/ho ... 39/zoom:15
The running of ships has slowed down a lot over the last few weeks. Many of the ships that make the journey from Emden to the UK are eithered moored up at the last port and at anchor. I have never seen it so quiet.
The Ems Highway is due to dock at Grimsby at 20.30 tonight.
The time to cross is around 24 hours but sometimes depending on tide it takes a little longer to dock.
When my Tiguan was shipped over 3 years ago it sat in the Humber Estuary for 2 days as it was too windy to dock.
But how do you know the names of the ships that VW uses?

I tracked my Ioniq a while back and there was a website which showed shipping schedules for the shipping company Hyundai used. It took nearly 2 months to get to the UK!
ID.3 Max Pro Performance Makena Turquoise

Week 34 - Stage 1 Order Complete
Week 35 - Stage 2 With the Factory
Week 38 - Stage 3 Build Week Scheduled for Wk22/2022
??? - Stage 4 Build Week Confirmed
??? - Stage 5 In Transit